Completed project · 2026

29.7 kWp rooftop photovoltaic system with 61.44 kWh battery storage in Momchilgrad.

A hybrid rooftop PV + ESS system with three Deye inverters operating in parallel and twelve 5.12 kWh battery modules.

Completed 29.7 kWp rooftop photovoltaic system with 61.44 kWh battery storage in Momchilgrad
PV + ESSReal project · Momchilgrad · 2026
01 · Location
Momchilgrad, Bulgaria
02 · Year
2026
03 · PV capacity
29.7 kWp
04 · ESS capacity
61.44 kWh
05 · Battery bank
12 × 5.12 kWh
06 · Architecture
3 parallel inverters

Technical overview

A scalable Deye architecture with three inverters and modular battery storage.

The system combines a 29.7 kWp rooftop photovoltaic plant with 61.44 kWh of battery storage. Three Deye hybrid inverters operate in parallel, while the battery bank consists of twelve 5.12 kWh SE-G5.1 Pro-B modules.

The batteries are organised into three 20.48 kWh clusters with separate protection enclosures. The rooftop PV array, inverter group, cable routes and ESS area form a coordinated system with a clear technical layout.

Next step

Let’s structure your project.

Send an enquiry